The phase schedule
The design broken into phases in dependency order, each with what it depends on, who does it, the half-days it takes and your own cost; the quotes you were given, compared on what they include; and the aftercare log for everything you have planted.
The phases sheet is essential, and its row order is the part worth keeping even if you change everything else: each stage gets walked on, driven over or dug up by the next. The quotes sheet becomes essential the moment somebody else is doing part of the work. The aftercare log starts the day you plant anything and matters for years rather than weeks, which is why it is here rather than in your memory.
Phases
The order of these rows is the dependency order, and it is the part worth keeping even if you change everything else. Costs are your own quotes and estimates; a blank means you have not priced it yet, and zero means it costs nothing.
Quotes
A quote is compared on what it includes, not on its total. Leave the figure blank until a real one arrives, so the sheet never shows a number nobody gave you.
Aftercare log
One row each time you water, mulch, stake or edit. The schedule it follows is daily for the first 1 to 2 weeks, every 2 to 3 days to week 12, then weekly, at 1 to 1.5 gallons per inch of trunk caliper, which is University of Minnesota Extension's; rain counts, and a hot week does not wait.
How to use these sheets
- One row per thing you would price or buy. Add your own lines under the phase they belong to, and delete the seeded rows that do not apply to your project.
- Keep the order. The seeded rows are in dependency order, from utilities marked through to lawn last. If you depart from it, write the reason in the row, because the commonest version of that departure is laying a lawn twice.
- Record, do not conclude. The cost and half-day columns hold your own quotes, prices and estimates; the who-does-it column and the dates are decisions. Mark an estimate as an estimate.
- A blank is not a zero. Leave a cost blank until you have a real figure. Blanks read as unknown, zero means free, and a total that sums over a blank says so.
- Compare quotes on the included and excluded columns, not on the amount. Two quotes for "a patio" usually differ in the base course and in who removes the spoil.
- Write a window where you have no date. "Spring, year two, inside the planting window" is a better entry than a specific Saturday two years out.
The phases sheet seeds the dependency order itself, with a few rows adjusted to the uses you marked in setup, and every cost deliberately left blank. The quotes sheet starts empty on purpose: a seeded price line would be a number nobody gave you. The worked examples are in Phasing the work: Rosalind (fictional) has one phase, which is the right answer for a 12-by-4-foot bed, and the Okonkwo household (fictional) has three, because their own figures put the money at about three years and their labor at just over one, so money sets the pace.
This is a planning record and nothing more. It is not a contract, a quote, a permit or a schedule anybody has agreed to. The costs are your own figures, because this manual prints no prices for plants, materials, labor or contractors. Whether a quote is fair, what a contract should contain, whether a permit is needed and what your rights are if work goes wrong are questions for a contractor, your local building office, your state's law and possibly a lawyer. The license and references tick boxes record that you checked; they are not a verification.