Paths, patios and structures: sizes, slopes and what to hire out
A patio sized by a published figure and staked out, path widths and slopes set, steps worked out from a published rule, and the work that is not yours named.
- Start here: the essentials
- 1. Which figures are published and which are not
- 2. Path widths
- 3. Sizing a patio
- 4. Slopes, and where steps become necessary
- 5. Steps: the 26-inch rule
- 6. Materials, and matching the house
- 7. Wood, and designing to board lengths
- 8. Lighting, and what light at night costs
- 9. The work that is not yours
- 10. See it: two hardscape decisions
- 11. Practice: stake it and check the slope
- 12. Your garden
- 13. Check your work
- 14. Knowledge check and scenario
Start here Essentials
Hardscape is the expensive, permanent part of a garden, and most of it is decided by three numbers: a width, a slope and a square footage. Deciding that none of it belongs in this phase is a real answer. Everything marked Go deeper is optional on a first pass.
- Measure the route people actually walk to and past the area, and write down its width (section 2).
- Measure its slope as a percentage, and check it against the published figures (section 4).
- Decide whether anything hard belongs in this phase, and write the decision down either way (section 9).
Minimum time: about 30 minutes outdoors. Done when: a width and a slope are written on the plan, or there is a written decision that no hardscape is in this phase.
1. Which figures are published and which are not Understand
Search for patio sizes or path widths and you will find a great many confident numbers. Almost none of them is sourced. They come from design blogs, paving retailers and contractors' marketing, and they circulate by being repeated.
This manual prints a small number of figures and says where each one comes from. Everything else is described rather than specified, and where there is no published figure, this chapter says so.
| Figure | Value | Published by |
|---|---|---|
| Front walk minimum width | 4 1/2 feet, so two people can walk abreast | NC State Extension |
| Patio size | About 64 square feet of hard surface per family member | University of Wisconsin-Madison Extension |
| Patio slope | 1 to 2 percent, away from the house | Wisconsin Extension |
| Walk slope | 1 to 4 percent ideal; 6 percent maximum for safety | Wisconsin Extension |
| Where steps are required | Where ground slopes more than 6 percent | Wisconsin Extension |
| Driveway slope | At least 1 percent to drain; over 10 percent is hazardous in winter | Wisconsin Extension |
| Outdoor step proportion | Two risers plus one tread equals 26 inches | Wisconsin Extension, described as a long-established standard |
| Walking room around outdoor chairs | 2 to 3 feet | NC State Extension |
| Retaining wall threshold | Seek professional assistance above four feet | Wisconsin Extension |
Everything in that table is from an extension service. Convention Notice what is not in it: the width of a secondary garden path, the size of a seating area for two, the depth of a base course, the spacing of posts. Those are real questions with real answers, and the answers are local, product-specific or a matter of practice. Where this chapter needs one it says whose practice it is, or sends you to a manufacturer's own instructions, which for a product you are buying is the document that matters.
2. Path widths
One published figure, and it is about sociability rather than about feet.
NC State Extension's chapter gives a front walk a minimum of 4 1/2 feet, so that two people can walk abreast. Convention That is the reason worth remembering: a 3-foot walk is wide enough for a person and forces a guest to arrive in single file behind you. For a front entrance, where the walk is doing a social job as well as a circulation one, the figure has a purpose behind it.
For every other path, the published figures run out and the method is to measure what has to pass:
- What goes along it. A wheelbarrow, a mower, a wheeled bin, a wheelchair, a person carrying a tray with their elbows out. Measure the widest, then add room for hands and for plants leaning in.
- How often, and by whom. A path to a compost heap used by one person weekly is a different thing from the route from the car to the door.
- What is beside it. A path between two beds needs more width than the same path against a wall, because planting flops. Drawing the planting plan treats this as a plant-spacing question: a plant at mature spread narrows the path by half its spread, and the site plan tool flags any measurement that falls below the path width you set.
- Whether turns are involved. A barrow needs more width to turn than to travel.
Make the measurement rather than taking a number from a website. Put the mower or the barrow on the route and see. That is five minutes and it is the only figure that describes your path.
3. Sizing a patio
Two methods, both covered in Beds, lawn and use areas, and worth restating because they get used at different moments.
From the furniture. Measure what will go on it, add NC State Extension's 2 to 3 feet of walking room around chairs, cut the shapes out of paper at the plan's scale, and lay them on the drawing. This is the accurate method when you know what furniture you will have.
From the household. Wisconsin Extension gives about 64 square feet of hard-surfaced patio per family member. A household of four is about 256 square feet; of two, about 128. This is the method when the furniture is undecided, and it is a useful check on the first: if the furniture method gives you 150 square feet for a household of four, the two figures disagree and it is worth knowing why.
NC State Extension adds a judgment worth taking seriously: err on the side of a larger space rather than a smaller one. Convention The reasoning is that a terrace too small is unusable in the way that matters, you cannot push a chair back, while a terrace slightly too large is merely a little more paving than necessary. Against that sits the cost per square foot and, in a small yard, the fact that every square foot of paving is a square foot not planted. The decision is yours; what the published figures do is tell you where the line is that you are choosing to cross.
Then stake it. NC State's own instruction after the paper exercise is to stake off the space and check that it is the right size, that the location takes advantage of the good viewpoints, and that the site suits it. A staked rectangle on the ground, left for a day, answers questions that no drawing does.
4. Slopes, and where steps become necessary
Every hard surface has a slope, including the ones you think are flat, and Wisconsin Extension publishes the figures that decide whether yours works.
- A walk is ideal at 1 to 4 percent and should be no more than 6 percent for safety.
- Where ground slopes more than 6 percent, install steps.
- A driveway needs at least 1 percent, which is 1 foot of rise per 100 feet, to drain, and more than 10 percent is hazardous in winter.
- A patio slopes 1 to 2 percent, away from the house.
The patio figure is the one that goes wrong most often in do-it-yourself work, in two directions. A patio laid dead level holds water in every slight hollow, and ice in winter. A patio sloped toward the house delivers rain to the wall, which is a building problem rather than a garden one. One to two percent is between an eighth and a quarter of an inch per foot, which is not visible to the eye and has to be set with a level and a measured drop.
Measuring is the board-and-level method from Water, drainage and slope, and the slope calculator turns a rise and a run into a percentage and compares it with the figures above.
These are outdoor garden figures from an extension service, not building code. Where a permit is involved, where a surface is a means of egress from a building, or where accessibility requirements apply, the governing numbers are your building department's and they are not these. Wisconsin Extension's own advice is to check local ordinances or obtain a building permit before construction. This manual sizes garden features; it does not certify that anything meets a code.
5. Steps: the 26-inch rule
Outdoor steps are proportioned differently from indoor stairs, and Wisconsin Extension publishes the rule: two risers plus one tread equals 26 inches, which it describes as a long-established standard for outdoor steps. Its two common combinations are 5 1/2-inch risers with 15-inch treads and 6-inch risers with 14-inch treads.
Check the arithmetic: two risers of 5 1/2 inches is 11, plus a 15-inch tread is 26. Two risers of 6 inches is 12, plus a 14-inch tread is 26. Convention The relationship exists because a person walking up a shallow outdoor flight takes a longer, flatter stride than on an indoor staircase, and a tread that is too short for its riser makes a flight that feels wrong underfoot even when every dimension is within a code.
To lay out a flight:
- Measure the total rise from the bottom of the slope to the top, with the board and level. This is the only number that matters, and it has to be right.
- Divide by a riser height you want, say 6 inches, and round to a whole number of risers. The real riser height is then the total rise divided by that whole number.
- Work out the tread from the rule: tread equals 26 minus twice the riser.
- Multiply the tread by the number of treads to find how much horizontal space the flight takes. This is the number that surprises people: six 15-inch treads is 7 1/2 feet of run, which may not fit where you were planning to put it.
- Check that every riser in the flight is the same height. This matters more than the exact figure, because an uneven riser in a flight is a trip.
The slope calculator does all of this from a rise and a run, and names the nearer of Wisconsin's two common combinations.
A flight of more than a couple of steps, steps that form part of a required exit from a building, or steps that are part of a retaining structure are not a garden project. Handrail requirements, riser consistency and the structure beneath are governed by local code, and the figures above do not satisfy it. Ask your building department what applies before you build, not after.
6. Materials, and matching the house
NC State Extension's position on hardscape material is that it should relate to the house: the materials used in the landscape look best when they repeat or complement the materials of the building. Preference That is a design judgment rather than a finding, and it is one of the more reliable ones, because it costs nothing to follow and because a house is usually the largest object in the view.
The comparison that matters for a decision is not appearance but the four columns below, and the materials table lets you filter rows on them.
| Ask | Why it decides |
|---|---|
| How permeable is it? | Whether it adds to your runoff problem or reduces it. NC State Extension treats permeable paving as a runoff and water-conservation decision |
| What does it need doing to it? | Gravel gets raked and topped up; timber gets treated; jointed paving gets weeded |
| Can you lay it yourself? | Loose materials are forgiving; anything laid on a base course is unforgiving and the base is the part that matters |
| What happens at the edges? | Most hard-surface failures start at an unrestrained edge |
| Is it slippery wet or icy? | Smooth surfaces in shade grow algae; this is a safety question, not a taste one |
Gravel deserves a sentence of its own because it is the cheapest honest surface available and it is frequently the right answer in a small garden: permeable, forgiving to lay, easy to change your mind about, and reversible, which matters to anyone renting or phasing. It is also unkind to wheels, migrates without a firm edge, and is hard work for a walker with a stick. Preference Where those limits do not bite, it is hard to beat for a first phase.
7. Wood, and designing to board lengths
NC State Extension's chapter covers the wood decisions and one of them is a piece of practical arithmetic that saves real money.
Design to standard board lengths. Lumber is sold in standard lengths, commonly 8, 10 and 12 feet. A deck designed at 10 feet 8 inches long means every board is cut from a 12-foot length with a piece wasted, so you buy more material and generate offcuts. Designing the same deck at 10 or 12 feet costs less and wastes less, and nobody will ever notice the difference. Convention The same logic applies to fencing, raised beds and any framed structure: let the standard length set the dimension unless there is a reason not to.
On durability, the publication covers decay-resistant heartwood, pressure-treated lumber and composites. Three things worth carrying away:
- Heartwood is the durable part of a decay-resistant species, and sapwood from the same tree is not. What you are buying is the part of the board, not just the name of the wood.
- Pressure-treated lumber's history matters because of CCA, the chromated copper arsenate treatment used in residential lumber until the early 2000s. Ask the authority If you are dealing with existing older treated timber, particularly where children play or food grows, what the treatment was and what to do about it is a question for your extension service or state environmental agency, not for a garden manual.
- Composites and modern treated lumber come with the maker's own instructions for spans, fixings and clearances, and those instructions are the specification. Product-specific A general figure from any book, this one included, does not override them.
8. Lighting, and what light at night costs
NC State Extension's chapter covers outdoor lighting and raises a consideration that most lighting advice leaves out: light pollution, and its effect on migrating insects and birds.
The design decisions, in the order they matter:
- What is the light for? Safety on a step, finding a lock, seeing a path, or looking at a planting. Each wants a different amount in a different place, and "lighting the garden" as a general ambition produces a yard lit like a parking lot.
- Down-lighting rather than up. Light aimed down puts the light where it is wanted; light aimed up puts most of it into the sky.
- The least light that does the job, and only when it is needed. A timer or a motion sensor is a design decision as much as a fitting is.
- Darkness as a feature. A small garden with three well-chosen lights reads better at night than one with fifteen.
Any lighting run from the house supply is electrical work. Outdoor circuits, their protection and their burial depth are governed by code and are a licensed electrician's job, not a weekend project. Low-voltage systems with a plug-in transformer are a different matter and come with the maker's own instructions, which govern. If in doubt, the test is whether anything you are doing touches a circuit that is not already a sealed, plug-in product.
9. The work that is not yours
This is the section the chapter exists for.
The following are not a reader's work, whatever their skill: a retaining wall more than four feet high, for which University of Wisconsin-Madison Extension advises seeking professional assistance; any wall holding ground above a structure, at any height; any grading that changes where water leaves the lot, since the same publication states that ground elevation must match the neighbors' at lot lines; electrical work on a house circuit; and work on a mature tree, which is a certified arborist's job. This manual designs around these. It does not tell you how to do them, and no figure in it should be read as a specification for one.
On walls specifically, Wisconsin Extension's other piece of advice is worth taking before the four-foot question even arises: a series of low terraced walls is generally preferable to one high wall. Convention Two 2-foot walls with a planted bench between them do the same job as one 4-foot wall, stay below the threshold, cost less to build, and are a far more forgiving thing to get slightly wrong.
Then there is the question of who you hire. NC State Extension makes a blunt point that is easy to miss: anyone may call themselves a landscaper. Licensing of landscape contractors varies by state and in many places there is none, which means the title tells you nothing. What to check instead:
- Whether your state licenses or registers this trade, which is a question for your state's licensing board.
- Insurance, confirmed by a certificate from the insurer rather than by a claim on a truck.
- References you actually call, for work of the same kind and at least a couple of years old, so you are seeing how it wore.
- A written scope, which is the thing that makes two quotes comparable. Phasing the work covers how to compare them, and Learn General Contracting's chapter on finding trades and comparing proposals goes further into what a contract should contain.
Permits are the last item and the one most often skipped. Wisconsin Extension's advice is to check local ordinances or obtain a building permit before construction. Ask the authority What needs one, in your jurisdiction, is a phone call to the building or planning office, and the call is free. The cost of not making it is discovering after the fact that a structure has to come down.
10. See it: two hardscape decisions See it
The Okonkwo terrace, Columbus, Ohio. Known: four in the household, a table for six twice a month, the terrace sited in the southeast corner after the stake-out in Beds, lawn and use areas. Furniture method: a 6-by-3-foot table with chairs out, plus 2 to 3 feet of walking room, comes to about 14 by 11, or 154 square feet. Wisconsin's per-person figure for four is 256. Assumed: that six at the table is the maximum they will size for, not the ten who come at Thanksgiving; that is their assumption, written down. Open: the slope across that corner, which they measured at 3.1 percent falling away from the house, within the published walk range and above the 1 to 2 percent a patio wants, so the paving will have to be laid to a shallower fall than the existing ground. What they chose: 180 square feet, between the two published figures, erring up as NC State suggests but not to 256, because every square foot of paving in a 1,536-square-foot yard is a square foot not planted. They staked it at 15 by 12 and left it a week. The laying is quoted out: a base course is the part of a patio that fails, and neither of them has laid one.
Harlan's front walk, Austin, Texas. Known: an existing concrete walk 3 feet wide from the drive to the door, a front yard being replanted, an HOA, and no intention of doing the work himself. Measured: the walk falls 4 inches over 22 feet, which is 1.5 percent, inside Wisconsin Extension's ideal band of 1 to 4 percent for a walk. The question: whether to widen it. NC State Extension's figure for a front walk is a minimum of 4 1/2 feet so two people can walk abreast, and his is 3. Assumed: that widening is permitted, which is the HOA's answer and not his. Open: whether the HOA approves a change to a front hard surface, and what the approval takes. What he chose: to put widening the walk in the quote as a separate line, so it can be included or dropped once the board responds, and to not touch the slope, which is already right and is the kind of thing a contractor might casually change. The second decision is the more valuable one: an existing surface that meets the published figure is worth protecting in the scope, because nothing in a quote says "leave the good thing alone" unless you write it.
- University of Wisconsin-Madison Extension, Landscape Structures: the slope figures, the 64 square feet per family member, the 26-inch step rule and the four-foot retaining wall threshold.
- NC State Extension Gardener Handbook, chapter 19: the 4 1/2-foot front walk, walking room around chairs, materials and the house, permeable paving, lighting, and the point that anyone may call themselves a landscaper.
11. Practice: stake it and check the slope Practice
Minimum: the walking route measured, its slope taken, and a written decision about whether anything hard is in this phase. Time: about 30 minutes. Materials: a tape, a straight board, a spirit level, canes and string, and whatever you actually push along the route: a barrow, a mower, a bin.
- Walk the route with the thing that uses it. Push the barrow, wheel the bin, carry the tray. Note where it is tight and where it turns.
- Measure the width at the tightest point, and write it on the plan.
- Measure the slope with the board and level: rise over run, as a percentage. Put it into the slope calculator and read the verdict against the published figures.
- If you are considering a patio, stake it at the size the furniture method gives, put the actual chairs on it, and leave it staked for a day.
- Write the decision down, including if the decision is that no hardscape belongs in this phase. A written "not yet" is a decision; an unwritten one gets remade every weekend.
Comparing paving materials properly
Use the materials table rather than a general impression. The columns that decide a small garden are permeability, what it needs doing to it, whether you can lay it, and what happens at the edge. Cost is the column most people start with and it is the least informative, because the installed cost depends on access, base preparation and your region far more than on the material.
What a good hardscape quote contains
Excavation depth and what happens to the spoil; the base course, its material and its compacted depth; edge restraint; the surface material by name and size; jointing; falls, stated as a percentage and in which direction; and what is excluded. A quote that is one line and a number gives you nothing to compare. Learn General Contracting's chapter on finding trades and comparing proposals treats this properly, and Phasing the work has the comparison sheet.
Where gravel fails
Gravel is this manual's favorite cheap surface and it has four failure modes worth knowing before you choose it: it migrates without a firm edge restraint; it is hard work for a wheelchair, a stick or a stroller; it travels indoors on shoes; and it needs topping up every few years. None of those is a reason not to use it. All of them are reasons to decide knowingly, and the first is the one that turns a good gravel terrace into a bad one within two seasons.
12. Your garden Your garden
13. Check your work Check your work
Criteria
- Every path has a width taken from what actually travels along it, measured rather than assumed.
- A front walk is checked against the 4 1/2-foot figure, and any shortfall is a decision rather than an oversight.
- Any patio is sized by both published methods, and the gap between them is a choice you made.
- Every hard surface has a slope written as a percentage, with a direction.
- Any steps are worked out from a measured total rise, with every riser equal.
- The work that is not yours is listed, with the four-foot wall threshold and the grading rule named.
- The permit question has been asked of the local office.
- A decision to build nothing hard in this phase is written down as a decision.
Worked example
Harlan's walk (fictional) is the better of the two examples because of what he decided not to do. The slope measured 1.5 percent, inside Wisconsin Extension's ideal band, which means the existing walk is already right in the one respect that is hardest to fix. Writing "do not alter the existing falls" into the scope is the kind of instruction a quote leaves out by default and that protects something good from being casually replaced. The widening question is handled correctly too: it is a separate line in the quote rather than an assumption, because the HOA's answer is not his to predict and a quote that bundles it gives him nothing to drop. The weakness is that the approval timeline is unknown, which is why it sits as a line item rather than as a phase with a date; Phasing the work is where that gets resolved.
Common mistakes
- Taking a path width from a website. Measure the barrow.
- Sizing a patio by eye, which reliably produces something a quarter too small.
- Laying a patio level, or falling toward the house.
- Uneven risers in a flight of steps, which is the trip hazard rather than the height itself.
- Forgetting the run a flight takes, and discovering that six steps need 7 1/2 feet you do not have.
- Designing timber to a dimension that wastes a standard length.
- Treating one high retaining wall as the obvious answer when two low terraces would do the job below the threshold.
- Assuming a landscaper is licensed because they are a landscaper.
- Not asking about a permit, which is a free phone call.
What is still unresolved
- What any of it costs: your own quotes, in Phasing the work. This manual prints no prices.
- Whether a permit is needed and what code applies: your local building or planning office.
- How a particular product should be laid: the maker's own instructions, which override anything here.
- Whether a wall, a grading change or an electrical run is safe as designed: a professional, by definition.
- What the beds between the hard surfaces will hold: Drawing the planting plan.